ANALISIS KINERJA SIMPANG TAK BERSINYAL JLN. LINTAS SUMATERA DAN JLN. PERTANIAN DENGAN MENGGUNAKAN METODE MKJI 1997

  • Teknik Sipil Unbara
  • Teknik Sipil Unbara
  • Teknik Sipil Unbara
Keywords: Intersection Performance, Capacity, Degree of Saturation and Opportunity queue

Abstract

Along with the population and economic growth of OKU Timur Regency, traffic problems, especially in the intersection area. The Sumatera and Agricultural Crossroads has heavy traffic because at the intersection, there are many public facilities and community housing around it.The purpose of this study is to determine the performance of the intersection with a signal on the Sumatera and Agricultural Cross Road, Martapura City, OKU Timur Regency, based on the analysis of the performance of the intersection with manual guidelines Indonesia's road capacity in 1997 (MKJI), the results of the intersection capacity of 1,977,856 smp/hour, the degree of saturation is 0,981, and the probability of the line is 38.82 – 76.34. Based on these values, the intersection of Sumatera and Agriculture Crossroads, the performance of the intersection is categorized as  unstable (D) according to the 1997 MKJI.

Published
2022-06-13
Section
Articles